KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  1-1-2010
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Finishing odds and ends

Over the last couple of weeks I did a little here and there on the project. Odds and ends that need to be done to finish up before moving to the airport. Among the tasks performed were: more engine cooling plenum sealing, fitting all the cowling fasteners to the cowling, fitting the cowling to the aircraft, running a ground wire for the fuel pressure switch, placarding the control stick, installing the cabin floor panels and bulkhead, installing the wing walk anti slip pad on the right wing, installing the aft fuselage elevator push tube, installing the canopy secondary latch, installing the cowling oil filler door, bonding the engine cooling air intake flexible duct and clamping on the engine cooling air intake rings.
' style=

Cowling fasteners installed and cowling fitted

Cowling fasteners installed and cowling fitted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.